...
首页> 外文期刊>UK McCloskey's Powerfocus >UK regulators assess quality of new reactors
【24h】

UK regulators assess quality of new reactors

机译:英国监管机构评估新反应堆的质量

获取原文
获取原文并翻译 | 示例

摘要

UK regulators have published inspection reports on quality management arrangements being used by Electricite de France (EDF), AREYA and Westinghouse, as part of the generic design assessment (GDA) being carried out for possible new reactor units in the UK. The Health and Safety Executive and the Environment Agency say the purpose of the inspections was to assess the adequacy of EDF/AREVA and Westinghouse quality assurance arrangements in four main areas: configuration control, control of modifications, internal audit, and selection and oversight of suppliers and manufacturers.
机译:英国监管机构已经发布了有关法国电力公司(EDF),AREYA和西屋公司正在使用的质量管理安排的检查报告,作为对英国可能的新反应堆装置进行的通用设计评估(GDA)的一部分。健康与安全执行官和环境局表示,检查的目的是评估EDF / AREVA和西屋质量保证安排在四个主要领域的充分性:配置控制,变更控制,内部审核以及供应商的选择和监督和制造商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号