...
首页> 外文期刊>U.S. Coal Review >Hoosier Energy reaches feds' 20th settlement regarding alleged NSR violations
【24h】

Hoosier Energy reaches feds' 20th settlement regarding alleged NSR violations

机译:Hoosier Energy就涉嫌违反NSR达成联邦第20条和解

获取原文
获取原文并翻译 | 示例

摘要

Hoosier Energy has agreed to install state-of-the-art pollution control technology at its two coal-fired power plants in Indiana, the U.S. Justice Department and Environmental Protection Agency revealed July 23. The utility said it would maintain flexibility in operating its generating stations to produce reliable power for member electric cooperatives and their consumer-owners. The settlement, filed in federal court the same day, will reduce emissions by more than 24,500 tons per year, and it requires Hoosier to pay a civil penalty of 950,000 dollars and spend 5 million dollars on environmental mitigation projects, according to the feds.
机译:美国司法部和环境保护署于7月23日透露,Hoosier Energy已同意在其位于印第安纳州的两个燃煤发电厂安装最先进的污染控制技术。该公司表示,它将保持运营发电的灵活性。站为成员电力合作社及其消费者所有者提供可靠的电力。据美联储称,该和解协议于同日提交联邦法院,每年将减少排放量超过24,500吨,要求Hoosier支付95万美元的民事罚款,并在环境缓解项目上花费500万美元。

著录项

  • 来源
    《U.S. Coal Review 》 |2010年第1814期| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号