...
首页> 外文期刊>U.S. Coal Review >CONSOL Energy's Shoemaker mine completes modernization project, looks like a young Jack Lalanne
【24h】

CONSOL Energy's Shoemaker mine completes modernization project, looks like a young Jack Lalanne

机译:CONSOL Energy的Shoemaker矿山完成了现代化项目,看起来像年轻的Jack Lalanne

获取原文
获取原文并翻译 | 示例
           

摘要

CONSOL Energy has started operation of a new fully belt coal haulage transport system at its Shoemaker mine near Moundsville, WV. Part of a total 205 million dollars capital improvement project begun at Shoemaker in 2003, actual underground work started in February 2006, with initial preparations to install a crossover belt and the rehabilitation of the 6 North shaft bottom area. The new, full conveyor belt haulage system transports all coal production from underground and replaces the previous method of moving coal via rail-cars.
机译:CONSOL Energy已在其位于西弗吉尼亚州Moundsville附近的Shoemaker矿场开始运行一种全新的全皮带煤炭运输系统。 2003年在Shoemaker中启动了总计2.05亿美元的资本改善项目,部分地下工程于2006年2月开始,最初的工作是安装跨界带并修复北轴6底部区域。全新的全传送带运输系统可运输地下所有煤炭,并取代了之前通过轨道车运输煤炭的方法。

著录项

  • 来源
    《U.S. Coal Review》 |2010年第1787期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号