首页> 外文期刊>Power Engineering International >CCS: Is the UK ready for 'capture-ready' coal fired plants?
【24h】

CCS: Is the UK ready for 'capture-ready' coal fired plants?

机译:CCS:英国是否准备好“准备就绪”的燃煤电厂?

获取原文
获取原文并翻译 | 示例
       

摘要

A report from the Environmental Audit Committee has called on the UK government to set a deadline for coal tired power stations to either adopt carbon capture and storage technology or face closure. How realistic is this? The Environmental Audit Committee, an influential parliamentary body, has published a report that strongly urges the UK government to set a deadline for all coal fired power stations be equipped with carbon capture ad storage (CCS) technology or face closure.
机译:环境审计委员会的一份报告呼吁英国政府为燃煤发电厂采用碳捕集与封存技术或面临封顶规定最后期限。这有多现实?具有影响力的议会机构环境审计委员会发布了一份报告,强烈敦促英国政府为所有燃煤电站配备碳捕集广告存储(CCS)技术或面临封堵规定截止日期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号