...
首页> 外文期刊>Power Engineering International >Stepping up a gear to boost efficiency
【24h】

Stepping up a gear to boost efficiency

机译:加大力度提高效率

获取原文
获取原文并翻译 | 示例
           

摘要

Design reviews and inspections of gear units, couplings and auxiliaries, from the latest technology systems to old-fashioned equipment, are vital to ensuring peak performance and long-term reliability. In the current economic climate, the need to keep operating costs low but efficiencies high are greater than ever. So the operators of power generating trains must evaluate every component in terms of lower costs, simpler maintenance and higher availability. Yet with the approach to selection, design and fabrication of power generating trains and their auxiliaries - including gear units and couplings - evolving apace, operators must keep up with each evolution. Gas turbine drivers are the backbone of the power generation industry. Whether in simple-cycle or combined-cycle power units, gas turbines allow for immediate starting capability, ideal where considerable variations in demand are expected and a fast response is required.
机译:从最新技术系统到老式设备的齿轮箱,联轴器和辅助设备的设计审查和检查,对于确保最佳性能和长期可靠性至关重要。在当前的经济形势下,保持运营成本低但效率高的需求比以往任何时候都更加重要。因此,发电列车的运营商必须在降低成本,简化维护和提高可用性方面评估每个组件。然而,随着动力火车及其辅助设备(包括齿轮箱和联轴器)的选择,设计和制造方法的不断发展,操作人员必须紧跟每次发展。燃气轮机驱动器是发电行业的骨干。燃气轮机无论是简单循环还是联合循环动力装置,均具有立即启动的能力,是理想的选择,可预期需求有很大变化并且需要快速响应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号