aerial perspective - Photogrammetry: An Oregon bridge project shows that this survey approach reduces risk, cost, and traffic delays

机译:鸟瞰图-摄影测量:俄勒冈州的一个桥梁项目表明,这种勘测方法降低了风险,成本和交通延误

获取原文
获取原文并翻译 | 示例
           

摘要

When engineer Laura Schmidt arrived at her dollar10 million bridge replacement project site, the surveyors were just beginning to lay out the stakes for the roadway approaches to the bridge and the contractor was finalizing construction of the bridge deck and preparing for construction of the roadway approaches. However, as soon as Laura got out of her car, her survey party chief abruptly stalked toward her, his face pale and grim with obvious worry. Before she could ask him what was going on, he uttered the last words any engineer wants to hear: "We have a problem." The party chief explained that the roadway approaches appeared to be six inches lower in reality than her design had anticipated. Her stomach fell as she considered the implications of this error. First, she would have to find a week's worth of time to revise her roadway specifications to reflect the actual conditions on the ground, as she had based her entire design on an inaccurate model produced by the survey crew. Next, Laura realized that because the roadway would need to be raised six inches, she would have to increase the quantity of roadway embankment fill materials. This would necessitate the costly process of preparing a change order and compensating the contractor for this large addition to his scope of work.
机译:当工程师劳拉·施密特(Laura Schmidt)到达她耗资1000万美元的桥梁更换项目工地时,测量师才刚刚开始规划通往桥梁的道路通道的桩基,承包商正在最终确定桥梁甲板的施工并为道路通道的施工做准备。然而,劳拉(Laura)下车后,她的调查小组负责人突然向她走来,脸色苍白而冷酷,令人担忧。在她问他发生了什么之前,他说出了任何工程师想听到的最后一句话:“我们有问题。”党的负责人解释说,巷道进近实际上比她的设计预期低了六英寸。考虑到这个错误的影响,她的肚子掉下来了。首先,因为她的整个设计都是基于调查人员制作的不准确模型,所以她将不得不花一周的时间来修改道路规格以反映地面的实际情况。接下来,劳拉意识到由于需要将车道抬高六英寸,因此她必须增加车道路堤填充材料的数量。这将需要昂贵的过程来准备变更单并补偿承包商的大量工作量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号