...
首页> 外文期刊>Proceedings of the Institution of Mechanical Engineers, Part O. Journal of Risk and Reliability >A production scheduling problem considering random failure and imperfect preventive maintenance
【24h】

A production scheduling problem considering random failure and imperfect preventive maintenance

机译:考虑随机故障和不完善的预防性维护的生产计划问题

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Many manufacturing companies are suffering from increasing machine wear with usage and age as degradation process. For a company to be successful, machines need to work continuously and make more profit in a certain period. However, machines can be unavailable due to the scheduled maintenance and unexpected failures. Hence, this study connects production scheduling with maintenance planning for a repairable system. Three types of maintenance are performed to restore the machines: (1) minimal repair is undertaken upon failure and the machine restored as bad as old; (2) replacement as a kind of perfect maintenance is implemented based on a cost-time rate function, which is defined to evaluate the economy of preventive maintenance action; and (3) preventive maintenance just makes the machine less deteriorated but not as good as new. Age reduction factor and failure rate increase factor are introduced to illustrate the imperfect character. The objective of this study is to maximize the total profit that is composed of production value, production cost, maintenance cost (including the preventive maintenance cost, replacement cost, and minimal repair cost for random failure), and lateness cost (which is contributed by the job sequence and maintenance activities). Finally, the proposed model is validated by a numerical example.
机译:随着使用和老化的退化过程,许多制造公司正遭受越来越多的机器磨损的困扰。为了使公司成功,机器需要连续工作并在一定时期内获得更多利润。但是,由于计划的维护和意外故障,计算机可能不可用。因此,本研究将生产计划与可修复系统的维护计划联系在一起。进行三种类型的维护以恢复机器:(1)在出现故障时进行最少的维修,并且将机器恢复为旧的坏状态; (2)根据成本-时间比率函数实现替换,将其作为一种完美的维护,该函数定义为评估预防性维护行动的经济性; (3)预防性维护只会减少机器的损坏,但不如新机器。引入年龄减少因子和故障率增加因子来说明不完美的特征。这项研究的目的是使总利润最大化,该总利润由产值,生产成本,维护成本(包括预防性维护成本,更换成本和针对随机故障的最小维修成本)和后期成本(由工作顺序和维护活动)。最后,通过数值例子验证了所提出的模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号