PRE-ASSEMBLED JUMPER INSTALLATION OF CALCULATED LENGTH FOR TRANSMISSION TOWER

机译:输电塔预装跨接长度的预装

获取原文
获取原文并翻译 | 示例
           

摘要

Prevailing practice to derive length of the jumper on tension towers is based on trial and error method, which consumes more time in construction activity. In this paper, we have described details of the program developed by us. It calculates the length of each jumper of every tension tower prior installation of jumper. Jumper can be assembled at store and carried to site to install, this can save time spent on trial and error method. Jumper Length for each loop is calculated based on actual tower dimensions, actual survey data and insulator string dimensions. Jumper can be cut and compressed at the site store in much controlled condition and install at site without any trial and error.
机译:推导塔上跳线长度的普遍做法是基于试错法,在施工过程中会花费更多时间。在本文中,我们描述了我们开发的程序的细节。它会在安装跳线之前计算每个张力塔的每个跳线的长度。跳线可以在商店组装并运送到现场进行安装,这可以节省花在反复试验方法上的时间。每个回路的跳线长度是根据实际塔架尺寸,实际测量数据和绝缘子串尺寸计算得出的。跳线可以在受控状态下在现场商店中进行切割和压缩,并可以在现场安装而不会发生任何反复试验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号