首页> 外文期刊>World highways >Kier picks up London tunnel deal
【24h】

Kier picks up London tunnel deal

机译:凯尔挑选了伦敦隧道交易

获取原文
获取原文并翻译 | 示例
           

摘要

Kier Highways has won a contract to maintain and manage London's road tunnels and associated 106 road pumping stations. The contract with Transport for London is worth around €226 million (£200million/US$275 million) over eight years and starts in April, with the option to extend by a further four years. It includes mechanical, electrical and control activities associated with each tunnel, renewals, safety inspections, intelligent transport systems and cleaning. The tunnel assets maintained under the new contract include the Blackwall, Rotherhithe, Green Man, George Green, Eastway, Upper Thames Street, Eltham, Fore Street and Hangar Lane. The new contract will also see the management of all of TfL's tunnels, including its tunnel river crossings, brought into the same team, with maintenance for all tunnels being delivered by Kier, making all of TfL's tunnels in London more efficient and quicker and easier for TfL to introduce new technology and best practice into the area, said Joe Incutti, group managing director at Kier Highways. The 1.5km single bore Rotherhithe tunnel was opened in 1908. It carries a two-lane carriageway 15m below the high-water level of the Thames, with a maximum depth of 23m below the surface. The 1.3km Blackwall Tunnel was originally opened as a single bore in 1897. By the 1930s, capacity was becoming inadequate and a second bore was opened in 1967. Kier is already working with TfL to maintain the capital city agency's main roads which carry around 30% of city traffic. Kier Highways said that the company now maintains 15 tunnels across the UK with a combined bore length of more than 10km.
机译:Kier Highways赢得了维护和管理伦敦的道路隧道和相关的106道路泵站的合同。与伦敦运输的合同价值超过2.26亿欧元(200万英镑/ 200万美元)超过八年,并于4月开始,该选项将延伸4年。它包括与每个隧道,续订,安全检查,智能运输系统和清洁相关的机械,电气和控制活动。在新合同下维持的隧道资产包括黑墙,灰尘,绿色男子,乔治绿色,东道,上泰晤士河街,Eltham,Free Street和Hangar Lane。新合同还将看到所有TFL隧道的管理,包括其隧道河流过境,带入同一支队,为吉尔提供的所有隧道进行维护,使所有TFL在伦敦的隧道更高效,更快更快,更容易Joe Incutti,Kier Highdays集团董事总经理兼任地区,TFL向该地区推出新技术和最佳实践。 1908年开业1.5公里的单孔避免隧道。它带有双线车道15米以下的泰晤士的高水位,最大深度为23m以下。 1.3公里的黑墙隧道最初于1897年作为一个钻孔开放。到20世纪30年代,容量变得不足,1967年开业了第二次钻孔。凯尔已经与TFL合作,以维持携带30左右的主要道路。城市交通的百分比。 Kier Highways表示,该公司现在在英国维护15个隧道,钻孔长度超过10公里。

著录项

  • 来源
    《World highways》 |2021年第1期|eu3-eu3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号