首页> 外文期刊>World highways >Alabama highway and bridge project
【24h】

Alabama highway and bridge project

机译:阿拉巴马州公路桥梁工程

获取原文
获取原文并翻译 | 示例
       

摘要

Environmental clearance has been awarded by the US Federal Highway Administration (FHWA) for the Interstate 10 Mobile River Bridge and Bayway project.This project has been subject to an environmental review for around 20 years. The Alabama Department of Transportation (ALDOT) says it has worked closely with the FHWA to attain the environmental clearance for the project, which is expected to cost around US$2.1 billion. With this clearance having been given, ALDOT can now issue requests for proposals for the project, which will be carried out under the PPP model, a first for Alabama. The centrepiece for the plan calls for a new 800m bridge spanning the Mobile River and carrying three lanes of traffic for 1-10 in either direction. In all, work will be carried out along a 16km section of 1-10, with the work including new Bayway bridges and seven improved interchanges.
机译:美国联邦高速公路管理局(FHWA)授予州际10州际移动河大桥和贝威项目环保许可,该项目已经接受了大约20年的环境审查。阿拉巴马州交通运输部(ALDOT)表示,它已与FHWA紧密合作以实现该项目的环境许可,该项目预计耗资约21亿美元。有了此许可,ALDOT现在可以发布该项目的提案请求,该请求将在PPP模式下进行,这是阿拉巴马州的首例。该计划的核心要求是一座新的800m桥梁,横跨莫比尔河(Mobile River),并在任一方向上载有3条行车道,每行1-10条。总之,将沿着1-10公里的16公里路段进行工程,其中包括新的Bayway桥和七个改进的立交桥。

著录项

  • 来源
    《World highways》 |2019年第8期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号