首页> 外文期刊>Travaux >Nouvelle liaison ferroviaire transalpine Lyon-Turin. La descenderie et galerie de reconnaissance de Modane/Villarodin-Bourget
【24h】

Nouvelle liaison ferroviaire transalpine Lyon-Turin. La descenderie et galerie de reconnaissance de Modane/Villarodin-Bourget

机译:新的里昂-都灵跨高山铁路线。莫达尼/维拉罗丹·布尔热的后代和认可画廊

获取原文
获取原文并翻译 | 示例
           

摘要

The new Lyons-Turin rail link will pass through the French Alps and will therefore require drilling several tunnels, the largest of which is the so-called base tunnel 52.6 km long, a double-tube structure in its definitive version, accepting high-speed train traffic, freight trains and trains transporting commercial vehicles. In accordance with the treaty following on from the Summit of 29 January 2001, the French and Italian governments have decided to undertake a research programme from 2001 to 2006, involving initial design and reconnaissance by galleries for the base tunnel. Work has begun on the decline and reconnaissance gallery of Modane/Vil-larodin-Bourget tunnel.
机译:新的里昂-都灵铁路将穿过法国阿尔卑斯山,因此将需要钻几条隧道,其中最大的一条是所谓的基础隧道,长52.6公里,是最终版本的双管结构,可以接受高速铁路火车交通,货运火车和运输商用车辆的火车。根据2001年1月29日首脑会议之后达成的条约,法国和意大利政府已决定从2001年至2006年进行一项研究计划,其中涉及对基础隧道的画廊进行初步设计和勘察。 Modane / Vil-larodin-Bourget隧道的衰落和侦察画廊的工作已经开始。

著录项

  • 来源
    《Travaux》 |2003年第794期|p.24-26|共3页
  • 作者

    P. Vignat;

  • 作者单位

    Lyon Turin Ferroviaire;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 fre
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号