...
首页> 外文期刊>Work Boat >Energy Level: Deepwater development is holding steady
【24h】

Energy Level: Deepwater development is holding steady

机译:能量水平:深水开发稳定

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Committed Gulf of Mexico deepwater development work still appears to be largely on schedule, albeit with some modifications, even as smaller operators shut-in production closer to shore. "The capex savings that we take this year are not coming from deepwater," Royal Dutch Shell Chief Executive Officer Ben Van Beurden said on April 30, after the company trimmed 2020 capital spending by $5 billion to cope with the oil price collapse aggravated by the demand sapping Covid-19 pandemic. Chevron suggested the same. CEO Michael Wirth said during a May 1 investor call, "the Gulf of Mexico has been resetting its cost structure to compete in a world like this. I think it means we've got more work to do to make the Gulf of Mexico compete even more, with more focus on tiebacks, infill drilling, utilizing existing infrastructure and finding efficient ways to develop in the Gulf of Mexico. And so that trend is one that we need to stay on."
机译:墨西哥海湾深水开发工作仍然似乎在很大程度上取决于时间表,尽管具有一些修改,即使是较小的运营商关闭生产更接近岸边。 “我们今年采取的资本支出储蓄不会来自深水,”荷兰皇家贝壳首席执行官Ben Van Beurden于4月30日表示,经过5020年的资金支出,以50亿美元以应付石油价格崩溃需求吸引Covid-19大流行。雪佛龙建议相同。 CEO Michael Wirth在5月1日的投资者呼叫中表示,“墨西哥湾一直在重置其成本结构,以便在这样的世界中竞争。我认为这意味着我们有更多的工作要做,以使墨西哥湾甚至争夺墨西哥湾竞争更多,更专注于重创,填充钻探,利用现有的基础设施,并在墨西哥湾寻找有效的方式发展。因此,趋势是我们需要留下的趋势。“

著录项

  • 来源
    《Work Boat》 |2020年第7期|9-9|共1页
  • 作者

    Jim Redden;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号