...
首页> 外文期刊>Work Boat >RECORD RIVER LEVELS ON LOWER MISS FORCE SPILLWAY OPENINGS
【24h】

RECORD RIVER LEVELS ON LOWER MISS FORCE SPILLWAY OPENINGS

机译:下无力溢洪道开口处的记录河水位

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Extraordinary flooding along the Mississippi River and its tributaries along with spring runoff of snow and ice forced the Corps of Engineers in June to open the Morganza Spillway for only the third time in its 65-year history. The purpose of the Morganza Flood-way is to divert excess floodwater from the Mississippi River into the Atchafalaya Basin. The floodway consists of two structures - the Morganza Control Structure and the Morganza Floodway - which are designed to pass up to 600,000-cu.-ft.-per-second (cfs) of water to the Gulf of Mexico, alleviating stress for mainline levees downstream along the Mississippi River. The Corps said the structure would be overtopped in June if the gates were not opened. The opening is only the third since high water events of 1973 and 2011.
机译:沿着密西西比河及其支流的特大洪水,加上春季的冰雪径流,迫使工程兵团在6月开放了Morganza溢洪道,这是其65年历史中的第三次。 Morganza洪水路的目的是将多余的洪水从密西西比河转移到Atchafalaya盆地。防洪堤由两个结构组成-Morganza防洪结构和Morganza防洪堤-旨在将高达600,000立方英尺/秒(cfs)的水输送到墨西哥湾,从而减轻了干线堤坝的压力密西西比河下游。兵团表示,如果不打开大门,该结构将在六月超顶。开幕只是1973年和2011年高水位事件以来的第三次。

著录项

  • 来源
    《Work Boat》 |2019年第7期|16-16|共1页
  • 作者

    Kirk Moore;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号