首页> 外文期刊>Work Boat >SHELL DRILLS IN CHUKCHI SEA
【24h】

SHELL DRILLS IN CHUKCHI SEA

机译:楚科奇海的贝壳钻

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Two weeks after granting Royal Dutch Shell permission to begin drilling for oil in the Chukchi Sea, President Obama was in Alaska to talk about his strategy on climate change - and pushing back on environmental activists who bitterly oppose his decision on the Shell venture. "Our economy still has to rely on oil and gas," Obama said. "As long as that's the case, I believe we should rely more on domestic production than on foreign imports." As Obama visited a shrinking glacier and coastal villages besieged by shoreline erosion, Shell's team was dealing with high seas and gale-force winds that forced suspension of operations on the Polar Pioneer semisubmersible rig leased from Transocean Ltd. High water was a problem on Alaska's north shore too, as Shell temporarily relocated some workers from housing in Barrow, Alaska, because of road flooding.
机译:在获得荷兰皇家壳牌公司的许可开始在楚科奇海钻探石油两周后,奥巴马总统在阿拉斯加谈论他的气候变化战略-并退回了对他对壳牌合资企业的决定表示强烈反对的环保主义者。奥巴马说:“我们的经济仍然必须依靠石油和天然气。” “只要是这样,我相信我们应该更多地依靠国内生产,而不是外国进口。”当奥巴马参观了一个不断缩小的冰川,沿海海岸线被侵蚀侵蚀时,壳牌公司的团队正在应对公海和强风,这迫使从Transocean Ltd租借的Polar Pioneer半潜式钻井平台的运营被迫中止。由于道路洪水,壳牌公司暂时将一些工人从阿拉斯加巴罗的住房中搬迁到了岸上。

著录项

  • 来源
    《Work Boat》 |2015年第10期|18-18|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号