...
首页> 外文期刊>WoodenBoat >Battery Management
【24h】

Battery Management

机译:电池管理

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Traditionally, the builders and maintainers of boats using more than one battery connected them in such a way as to afford the user some degree of redundancy, and with good reason: It's vitally important to be able to start the engine when you want to. The most common battery installation involved two equally sized battery "banks" that were connected to the engine via a battery selector switch offering [battery] 1, [battery] 2, BOTH [batteries combined in parallel] and [all batteries] OFF. The switch enabled the user to "manage" both the current leaving the batteries (for starting and other vessel loads) and the current that is sent to the batteries from the engine-driven alternator. Typically, for starting purposes, the skipper turns the multi-position switch to BOTH, which allows the engine's starter to receive the maximum amount of cranking amperage by drawing from both banks.
机译:传统上,使用不止一个电池的船只的制造商和维修商以一定程度的冗余为用户提供连接,并且有充分的理由:能够在需要时启动发动机至关重要。最常见的电池安装涉及两个大小相等的电池“组”,它们通过一个电池选择器开关连接到发动机,该开关提供[电池] 1,[电池] 2,两个[并联电池]和[所有电池]关。该开关使用户能够“管理”离开电池的电流(用于启动和其他容器负载)以及从发动机驱动的交流发电机发送到电池的电流。通常,出于启动的目的,船长将多位置开关转到BOTH,这使得发动机的启动器可以通过从两排吸取来接收最大的启动电流。

著录项

  • 来源
    《WoodenBoat》 |2011年第220期|p.a3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号