...
首页> 外文期刊>Wire rope news and sling technology >Deluge of dam work for wire rope and fittings suppliers
【24h】

Deluge of dam work for wire rope and fittings suppliers

机译:钢丝绳及配件供应商的大坝工程洪水

获取原文
获取原文并翻译 | 示例

摘要

Last year Ulven Co. was awarded a contract from the US Army Corp of Engineers for wire rope assemblies for a number of dams in Oklahoma. An interesting fact about this contract was that the money was provided through the American Recovery and Reinvestment Act of 2009. This is the largest award for just wire ropes under the Act! The contract was worth nearly $3 million. Over one hundred years ago, before Oklahoma was even a state, farmers working the fertile land in the vicinity of the Arkansas River founded Kaw City. The discovery of oil nearby added to the hectic pace of life in the area. But watery weather soon caught up with the town during a devastating 1923 flood of the region. Spirits not broken by that event were no doubt finished oil during the Great Dust Bowl resulting during the heart of the Great Depression of the 1930s.
机译:去年,Ulven公司获得了美国陆军工程公司的合同,该合同涉及俄克拉荷马州许多水坝的钢丝绳组件。关于该合同的一个有趣的事实是,这笔钱是通过2009年《美国复苏与再投资法案》提供的。这是该法案下仅钢丝绳的最大一笔奖励!合同价值近300万美元。一百多年前,在俄克拉荷马州还没建立州之前,在阿肯色河附近耕种肥沃土地的农民就建立了K城。附近的石油发现增加了该地区的生活节奏。但是在1923年该地区毁灭性的洪灾期间,潮湿的天气很快就赶上了小镇。毫无疑问,没有被那次事件破坏的烈酒在1930年代大萧条的心脏所产生的“大沙尘暴碗”中就是成品油。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号