首页> 外文期刊>Windpower monthly >Hot Competition For A Place On The List
【24h】

Hot Competition For A Place On The List

机译:榜单上的热门竞争

获取原文
获取原文并翻译 | 示例
           

摘要

For the wind project developers eagerly awaiting news of Croatia's new renewable energy policy late last year, 2007rnproved to be the bearer of bad news, although it was not altogether unexpected. Though developers have 1500 MW lined up for Croatia worth €1 billion, a cap of 360 MW has been applied by the power system operator and is likely to remain in place for the next several years. Croatia has just 17 MW of wind power online, a figure now static for over a year, though that should change in 2008, with 67.8 MW of projects in construction expected to boost cumulative capacity to around 85 MW.rnNews of the 360 MW cap applied by HEP-Operator Prijenosnog Sustava (HEP-OPS) came less than a monthrnafter the government raised its renewables target to 5.8% of electricity supplies by 2010, placed a renewable energy obligation on utilities, and set a purchase price for wind power, deemed good enough by developers, of HRK 0.64-0.65/kWh (€0.08/kWh) for the first 12 years of operation.
机译:对于风能项目开发商来说,他们迫切地等待着克罗地亚去年年底出台的新可再生能源政策的消息,尽管事实并非完全出乎意料,但2007年被证明是坏消息的发源地。尽管开发商为克罗地亚排定了1500兆瓦的市场,价值10亿欧元,但电力系统运营商已将上限设定为360兆瓦,并可能在未来几年内保持不变。克罗地亚只有17兆瓦的风电在线发电,这一数字现在已经稳定了一年多,尽管在2008年应该会改变,预计67.8兆瓦的在建项目将使累计发电量增加到85兆瓦左右。由HEP运营商Prijenosnog Sustava(HEP-OPS)发布不到一个月,此前政府将其可再生能源目标提高到2010年的电力供应的5.8%,对公用事业负有可再生能源义务,并设定了被认为良好的风电购买价格开发的头12年,开发人员的费用为0.64-0.65 HRK / kWh(€0.08 / kWh)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号