...
首页> 外文期刊>Wiley Interdisciplinary Reviews: Energy and Environment >Competitive cross-voltage level procurement of reactive power considering reliable capacity from wind and photovoltaics
【24h】

Competitive cross-voltage level procurement of reactive power considering reliable capacity from wind and photovoltaics

机译:考虑到风力和光伏发电的可靠容量,无功功率的竞争性跨电压水平采购

获取原文
获取原文并翻译 | 示例
           

摘要

Transition toward high shares of power production from wind and photovoltaics(PV) brings about a substantial increase in controllable reactive power (Q). Thecapability to provide Q independent of active power production (24/7) is availableat comparably low or even zero investment cost. Yet, this capability is not requiredby network connection codes and only rarely utilized, even if available. In a firststep, we take an overall economic perspective and review the economic competitionof 24/7 Q provision from variable renewable power plants (VRPP) with alternativeQ resources. Technical restrictions to be respected are discussed, as well asthe reliability requirements related to investment-planning relevant Q provision.Competitiveness is significantly influenced by Q utilization rate and connectingvoltage level. For practical implementation of 24/7 Q procurement from VRPP, itsvalue needs to be assessed. We review possible approaches from overall economicperspective. We conclude that in operational decisions, VRPP Q should be valuedat marginal cost, whereas in Q investment planning decisions, full cost should beconsidered. We derive the pros and cons of making 24/7 Q provision a mandatorypart of network connection codes. For system operators (Sos) to integrate availablecapacity, regulatory acknowledgment of related revenue impact should be considered.We present possible solutions. Summarizing, the contribution presents thestatus quo in research on cross-voltage level, investment-relevant Q provision byVRPP. Using the presented methodology for value assessment, areas for furtherresearch are systematically pointed out.
机译:从风能和光伏发电向高发电份额的过渡 r n(PV)导致可控无功功率(Q)的大幅增加。 r n具有相对较低甚至什至零的投资成本,能够独立于有功功率生产(24/7)提供Q的功能。但是,网络连接代码并不需要此功能,即使可用,也很少使用。第一步,我们从整体经济角度出发,回顾来自具有可变替代能源的可变可再生能源发电厂(VRPP)提供的24/7 Q的经济竞争。讨论了要遵守的技术限制,以及与投资计划有关的Q规定有关的可靠性要求。 r n竞争力受Q利用率和连接电压水平的影响很大。为了从VRPP实际实施24/7 Q采购,需要评估其价值。我们从整体经济角度回顾了可能的方法。我们得出的结论是,在运营决策中,VRPP Q应该被评估为边际成本,而在Q投资计划决策中,应考虑全部成本。我们得出使24/7 Q设置成为网络连接代码的强制性 n n的利弊。为了使系统运营商(Sos)集成可用的 r ncapacity,应考虑相关收入影响的监管确认。 r n我们提出了可能的解决方案。总而言之,该贡献呈现了跨电压水平研究中的现状,由VRVR提供了投资相关的Q规定。使用提出的方法进行价值评估,系统地指出了需要进一步研究的领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号