首页> 外文期刊>WET News >Siltbusting wastewater
【24h】

Siltbusting wastewater

机译:淤泥废水

获取原文
获取原文并翻译 | 示例
       

摘要

Phase One of a £35.6M road project serving the Forth Road Bridge in Scotland is meeting string stringent environmental targets for wastewater discharged from site, despite a high level of suspended solids, thanks to the 24-hour operation of two HB50 Siltbuster mobile silt traps. We look at how the Siltbuster has been benefiting the project. The M9 Spur Extension/A90 Upgrade is designed to ease southbound congestion on the Forth Road Bridge and surrounding area. The new road will divert 90% of traffic from the existing overburdened A8000, which will revert to a local road between Kirkliston and South Queens-ferry.
机译:为苏格兰的福斯路大桥服务的耗资3,560万英镑的道路项目的第一阶段正在实现严格的环境目标,即尽管有大量悬浮固体,但由于两个HB50 Siltbuster移动式泥沙收集池可24小时运行,因此排出的废水量很高。我们看一下Siltbuster如何使该项目受益。 M9支线扩展/ A90升级旨在缓解第四路桥梁及周边地区的南行交通拥堵。新的道路将把现有超负荷的A8000的交通量转移90%,而A8000则将重新转换为Kirkliston和South Queens-Ferry之间的本地道路。

著录项

  • 来源
    《WET News》 |2006年第5期|p.10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水利工程;
  • 关键词

  • 入库时间 2022-08-18 00:22:32

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号