首页> 外文期刊>WET News >Work on tank keeps rolling on
【24h】

Work on tank keeps rolling on

机译:坦克上的工作不断

获取原文
获取原文并翻译 | 示例
       

摘要

Scaffolding is being erected in the launder channel of a final-settlement tank taking shape at Bolton Wastewater Treatment Works. Measuring 46m in diameter and 6m deep, four tanks are being constructed by the Galliford Try, Costain and Atkins combined venture under AMP4 for client United Utilities (UU) They will be the largest tanks at any UU waterworks. Also included in the £40M scheme are two new primary settlement tanks, refurbishment and modifications to existing aeration lanes, and a new sludge-handling facility, chemical-dosing plant and inlets works.
机译:在波尔顿废水处理厂正在成型的最终沉淀池的洗涤槽中架设脚手架。 AMP4下的Galliford Try,Costain和Atkins合资企业为客户联合公用事业公司(UU)建造了直径为46m,深度为6m的四个水箱,它们将是所有UU水厂中最大的水箱。 M40M计划中还包括两个新的主要沉淀池,对现有曝气通道进行翻新和改造,以及一个新的污泥处理设施,化学计量厂和进水口工程。

著录项

  • 来源
    《WET News》 |2008年第5期|p.3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水利工程;
  • 关键词

  • 入库时间 2022-08-18 00:22:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号