首页> 外文期刊>WET News >Piping up for Boston
【24h】

Piping up for Boston

机译:前往波士顿

获取原文
获取原文并翻译 | 示例
       

摘要

The Population of Lincolnshire is growing and responsibility for providing a clean, safe and sustainable water supply to Lincolnshire falls to Anglian Water Services. It was identified in Anglian Water's AMP5 business plan that additional resources were needed to meet the forecast water requirements for the growing town of Boston and surrounding area. There was also a need to provide resilience to the West Pinchbeck Water Treatment Works (WTW). Ian Turner, special projects delivery manager at Anglian, explains: "The population of Boston is expected to rise significantly over the next 25 years and this will put pressure on existing supplies.
机译:林肯郡的人口在增长,向林肯郡提供清洁,安全和可持续的供水的责任落到了安吉利安水务局。 Anglian Water的AMP5商业计划中确定,需要额外的资源来满足增长中的波士顿镇和周边地区的用水需求预测。还需要为West Pinchbeck水处理厂(WTW)提供弹性。 Anglian的特殊项目交付经理Ian Turner解释说:“预计波士顿人口在未来25年内将大大增加,这将给现有供应带来压力。

著录项

  • 来源
    《WET News》 |2012年第10期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:20:53

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号