首页> 外文期刊>WET News >WEM deal leads to Leeds work
【24h】

WEM deal leads to Leeds work

机译:WEM交易导致利兹工作

获取原文
获取原文并翻译 | 示例
       

摘要

BMM, the BAM Nuttall and Mott MacDonald joint venture, was set up to deliver coastal and fluvial works under the Environment Agency's Water and Environment Management (WEM) framework. As part of the deal, the joint venture is delivering assets and projects in their entirety from conception to completion, including project appraisals, design development and early contractor involvement, design and build contracts, managing programmes of work and the operation and maintenance of assets. The framework also led to BMM being selected for a £23M contract to deliver flood protection for Leeds. The deal was procured through the WEM framework by Leeds City Council It involves works extending for 4.3km from the city mainline railway station to just below Knostrop weir. It will see the replacement of the existing fixed weirs at Crown Point and Knostrop with moveable ones that can be lowered in flood conditions to reduce river levels and the threat of river flooding.
机译:BMM是BAM Nuttall和Mott MacDonald的合资企业,其成立是为了在环境署的水与环境管理(WEM)框架下提供沿海和河道工程。作为交易的一部分,该合资企业将从概念到完成全部交付资产和项目,包括项目评估,设计开发和早期承包商介入,设计和建造合同,管理工作计划以及资产的运营和维护。该框架还导致BMM被选中与一项价值2300万英镑的合同,为利兹提供防洪服务。该交易是由利兹市议会通过WEM框架进行的,涉及的工程从城市干线火车站延伸至Knostrop堰下方仅4.3公里。它将在克朗波特角和克诺斯特罗普替换现有的固定堰,并在洪水条件下将其降低,以减少河流水位和洪水威胁。

著录项

  • 来源
    《WET News》 |2014年第11appa期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:19:49

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号