首页> 外文期刊>WET News >Infrastructure firms sign up to carbon review
【24h】

Infrastructure firms sign up to carbon review

机译:基础设施公司签署碳审查

获取原文
获取原文并翻译 | 示例
       

摘要

Thames Tideway Tunnel, Kier Infrastructure and Barhale Trant Utilities are the latest signatories to the Green Construction Board-led Infrastructure Carbon Review (ICR). The new commitments were made at the Infrastructure Carbon Review One Year On Conference, hosted by the Department for Business, Innovation and Skills (BIS). Launched in 2013, the ICR scheme is a joint industry and government initiative targeted at leading businesses and their supply chains with the aim of making carbon reduction an integral part of the UK's infrastructure construction.
机译:泰晤士河潮道隧道,基尔基础设施和Barhale Trant公用事业公司是绿色建筑委员会牵头的基础设施碳审查(ICR)的最新签署者。新的承诺是在由商务,创新和技能部(BIS)主办的“一年一度的基础设施碳审查”会议上做出的。 ICR计划于2013年启动,是一项针对领先企业及其供应链的行业和政府联合计划,旨在使减少碳排放成为英国基础设施建设不可或缺的一部分。

著录项

  • 来源
    《WET News》 |2014年第12期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号