首页> 外文期刊>WET News >The challenge: Reducing capex while optimising assets
【24h】

The challenge: Reducing capex while optimising assets

机译:挑战:在优化资产的同时减少资本支出

获取原文
获取原文并翻译 | 示例
       

摘要

With AMP6 now just months away, water companies face the challenge of managing the costs of investment in new infrastructure while ensuring that projects are delivered on time. And yet, when it comes to hiring equipment rather than purchasing new assets, many are still reluctant to hire rather than buy. Some of that reluctance is prompted by the need to agree terms and conditions and concerns that this will precipitate onerous delays for the project. It is true that there are no standard equipment hire terms and conditions for the water industry, unlike the construction sector, for example, where most contractors use the Construction Plant Association (CPA) standard terms.
机译:距离AMP6仅有数月的路程,自来水公司面临着在管理新基础设施投资成本的同时确保项目按时交付的挑战。但是,在租用设备而不是购买新资产时,许多人仍然不愿租用而不是购买。某些不情愿是由于需要同意条款和条件而引起的,并且担心这会导致项目的严重延误。的确,与建筑行业不同,水行业没有标准的设备租赁条款和条件,例如,大多数承包商使用建筑厂协会(CPA)标准条款。

著录项

  • 来源
    《WET News》 |2014年第9期|25-25|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:19:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号