首页> 外文期刊>WET News >UU plans Oldham WwTW overhaul
【24h】

UU plans Oldham WwTW overhaul

机译:UU计划对Oldham WwTW进行大修

获取原文
获取原文并翻译 | 示例
           

摘要

United Utilities (UU) has announced a £114M overhaul of its wastewater treatment works in Chadderton and Royton to improve river water quality in the River Irk as well as meet obligations under the Freshwater Fish Directive by improving the standard of treatment and reducing stormwater overflows. The three-year project will involve decommissioning the treatment process at Royton and building additional storage tanks there to contain more of the storm flows. An underground pipeline will be laid to transfer sewage around 4.5km to the Old-ham WwTW at Chadderton.
机译:联合公用事业公司(UU)已宣布对其查德顿(Chadderton)和罗伊顿(Royton)的废水处理厂进行大修,耗资1.14亿英镑,以改善伊尔河(River Irk)的河水水质,并通过提高处理标准和减少雨水溢流来履行淡水鱼指令的义务。这个为期三年的项目将涉及在Royton停止处理过程,并在那里建造更多的储罐以容纳更多的暴风雨。将铺设一条地下管道,将约4.5公里的污水输送到查德顿的Old-ham WwTW。

著录项

  • 来源
    《WET News》 |2014年第5期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号