Stillingfleet water pumping station was originally constructed by British Coal in the early 1990s when mining subsidence lowered the ground level and prevented water in this low-lying area draining away by gravity into the nearby beck. Now the responsibility of Ouse & Derwent Drainage Board, the facility has had two new submersible Bedford pumps installed while two pumpsets that had been removed from service have been overhauled. The work has been carried out by AxFlow. Mark Redgrove, AxFlow's technical support manager, explains: "Earlier this year the drainage board detected that the moisture readings within the pump linings were a cause for concern. "Although the pumping station is equipped with two 800mm rising main storm and two 600mm rising main dry weather pumps, the drainage board recognised that they could not be two pumps down for a prolonged period so two new submersible Bedford pumps were ordered. We were called to remove the old Bedford SB pumps and install the new pumps."
机译:Stillingfleet抽水站最初是由英国煤炭公司(British Coal)在1990年代初建造的,当时开采塌陷降低了地面高度,并阻止了该低洼地区的水由于重力作用而流到附近的贝克。现在,由Ouse&Derwent排水委员会负责,该设施已安装了两台新的Bedford潜水泵,同时已对已经停用的两台泵进行了大修。该工作已由AxFlow进行。 AxFlow技术支持经理马克·雷德格罗夫(Mark Redgrove)解释说:“今年早些时候,排水板发现泵衬里的水分读数令人担忧。”尽管泵站配备了两个800mm上升主雨和两个600mm上升主雨。对于干旱天气的泵,排水委员会认识到不能长时间停机购买两台泵,因此订购了两台新的Bedford潜水泵。我们被要求拆除旧的贝德福德SB泵并安装新的泵。”

著录项

  • 来源
    《WET News》 |2015年第11期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:19:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号