首页> 外文期刊>WET News >The challenge: Putting the pipes to bed
【24h】

The challenge: Putting the pipes to bed

机译:挑战:将管道放在床上

获取原文
获取原文并翻译 | 示例
       

摘要

When a drainage pipeline is buried in the ground, loads are transferred between the pipe and the surrounding earth by the bedding surrounding the pipe. There are three main types of loads that apply: the weight of the overlying trench-fill, pressures transmitted to the pipe from surface loads such as traffic, and the supporting reaction from the ground beneath the pipe. In addition, for larger diameter pipes the load imposed by water in the pipe may also need to be considered. There are various bedding solutions or Classes described in British Standard 9295: Guide to the Structural Design of Buried Pipelines. The most significant differences between bedding Classes is the extent of the area around the pipe where the granular bedding material is placed. Class S bedding, for example, requires a pipe to be completely surrounded by granular material. Other Classes, such as B, F and N require significantly less granular material.
机译:当排水管道埋在地下时,负载将通过管道周围的垫层在管道和周围的土壤之间转移。施加的载荷主要有三种:上覆式沟槽填充物的重量,表面载荷(如交通)传递给管道的压力以及管道下方地面的支撑作用。另外,对于较大直径的管道,还可能需要考虑管道中水所施加的负载。英国标准9295:地下管道结构设计指南中描述了多种床上用品解决方案或类。床上用品类别之间最显着的区别是放置颗粒状床上用品的管道周围区域的范围。例如,S级床上用品要求管道完全被粒状材料包围。其他类别(例如B,F和N)所需的颗粒材料少得多。

著录项

  • 来源
    《WET News》 |2015年第6期|18-19|共2页
  • 作者

    Stuart Crisp;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:19:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号