Mott MacDonald Bentley (MMB) has contracted .Saxlund International to design and install a new sludge cake truck loading silo for Severn Trent Water's Coalport Sewage Treatment Works (STW) in Shropshire to improve efficiency. The new raised storage and discharge silo is part of a programme of improvement works carried out by MMB under its AMP6 contract with Severn Trent Water. The project scope includes the construction of a raised loony circular storage silo designed to allow de-watered sludge to be directly loaded into trucks below. The solution, which will handle 26.3m~3 per day.
展开▼