首页> 外文期刊>WET News >Saxlund contracted for sludge cake silo scheme
【24h】

Saxlund contracted for sludge cake silo scheme

机译:萨克斯隆签订污泥饼仓计划

获取原文
获取原文并翻译 | 示例
       

摘要

Mott MacDonald Bentley (MMB) has contracted .Saxlund International to design and install a new sludge cake truck loading silo for Severn Trent Water's Coalport Sewage Treatment Works (STW) in Shropshire to improve efficiency. The new raised storage and discharge silo is part of a programme of improvement works carried out by MMB under its AMP6 contract with Severn Trent Water. The project scope includes the construction of a raised loony circular storage silo designed to allow de-watered sludge to be directly loaded into trucks below. The solution, which will handle 26.3m~3 per day.
机译:莫特·麦克唐纳·本特利(MMB)已与.Saxlund International签订合同,为其在Shropshire的Severn Trent Water的Coalport污水处理厂(STW)设计和安装新的污泥蛋糕装载仓。 MMB根据与Severn Trent Water签订的AMP6合同,进行了改进工程,该新的升高的储水和卸料井是工程的一部分。该项目的范围包括建造一个隆起的圆形循环贮仓,该贮仓的设计目的是将脱水的污泥直接装载到下面的卡车中。该解决方案每天将处理26.3m〜3。

著录项

  • 来源
    《WET News》 |2016年第10期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:18:47

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号