首页> 外文期刊>WET News >Tideway uses barge to position crane
【24h】

Tideway uses barge to position crane

机译:Tideway使用驳船定位起重机

获取原文
获取原文并翻译 | 示例
       

摘要

Tideway has started the major work to clean up London's River Thames with two boats pushing a barge supporting a crane into position near Blackfriars Bridge. The move, being undertaken by VolkerStevin for Tideway, means work can start on a new pier in preparation for construction of the super sewer. Andy Alder, Central Project Delivery manager for Tideway, said: "Getting the barge into place was no mean feat. The 20m wide barge had to be carefully threaded under seven bridges and through the traffic on one of the busiest working rivers in the world. Alongside the man-made challenges, the crane also needed perfect tidal water levels and good weather before the movement could go ahead."
机译:泰德威(Tideway)已经开始了清理伦敦泰晤士河的主要工作,两条船将一艘支撑起重机的驳船推入黑修士桥附近。 VolkerStevin为Tideway采取了此举,这意味着可以在新码头上开始工作,以准备建造超级下水道。 Tideway的中央项目交付经理安迪·奥尔德(Andy Alder)表示:“将驳船安装到位绝非易事。必须将20m宽的驳船小心地穿入7座桥下,并穿越世界上最繁忙的河流之一的交通。除了人为的挑战,起重机还需要完美的潮汐水位和良好的天气,才能继续前进。”

著录项

  • 来源
    《WET News》 |2016年第1期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:18:40

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号