【24h】

VIEWPOINT

机译:观点

获取原文
获取原文并翻译 | 示例
       

摘要

In the current economic climate, water companies are under increasing pressure to develop cost-effective replacement and rehabilitation strategies for their water supply pipeline networks. Operating with limited budgets, asset managers are faced with the challenge of determining how long a pipeline can be left in the ground before approving expenditure on rehabilitation or replacement.In practice, this depends on assessing the costs incurred from pipe failure against those incurred preventing failure through inspection condition assessment, rehabilitation and/or replacement.
机译:在目前的经济气氛中,水资源公司正在增加压力,为其供水管道网络制定具有成本效益的更换和康复战略。经营有限预算,资产管理人员面临着确定在康复或更换支出之前可以在地面留在地面的挑战。在实践中,这取决于通过检查条件评估,康复和/或更换来评估管道失效的费用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号