...
首页> 外文期刊>Waterways world >FLOOD-PROOF VISITOR MOORINGS IN BATH
【24h】

FLOOD-PROOF VISITOR MOORINGS IN BATH

机译:浴室防潮访客系泊系统

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Following extensive flooding over the winter, the Canal & River Trust has erected a new landing stage on the visitor moorings near Pulteney Bridge in Bath. The new moorings are an impressive structure. They should make it much safer for boaters joining or leaving the Kennet & Avon Canal who stop here during high water levels. Until now it has not been easy to moor at this point, with piled sides and old steps right at the entrance of the canal alongside a stormwater and stream outlet - particularly when the river was fast-flowing. The very high rise and fall piles give an indication of how the level of the River Avon can increase. Observant boaters will have seen the impressive levels of past floods recorded beneath the nearby footbridge.
机译:整个冬天,洪水泛滥之后,Canal&River Trust在巴斯的Pulteney桥附近的游客泊位上架起了新的着陆平台。新的系泊结构令人印象深刻。对于在高水位时停在此的Kennet&Avon运河的船民来说,它们应该更加安全。到现在为止,要在这里停泊并不是一件容易的事,在运河的入口处旁边是堆积如山的台阶和古老的台阶,旁边是雨水和溪流出口-特别是在河流急流的时候。很高的上升和下降桩表明了如何提高雅芳河的水位。细心的船夫将看到附近行人天桥下记录的令人印象深刻的过去洪水。

著录项

  • 来源
    《Waterways world》 |2013年第5期|37-37|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号