首页> 外文期刊>Water >INNOVATION IN DESIGN OF AN 11 KM SEWER PIPELINE
【24h】

INNOVATION IN DESIGN OF AN 11 KM SEWER PIPELINE

机译:11公里污水管道设计的创新

获取原文
获取原文并翻译 | 示例
       

摘要

The village of Appin has been identified by the Department of Environment, Climate Change and Water as high priority for provision of sewerage under the NSW Government Priority Sewerage Program (PSP). Sydney Water's preferred scheme is to provide a pressure sewer network for the existing village, and transfer the sewage to the Glenfield sewerage system some 10.9 km to the north and 70m lower in elevation. The route initially rises 30 m then drops 104 m before rising in its final section. It is also underlain by coal measures which are being mined, causing significant ground subsidence. Concept design of the transfer system comprised a pumping station in Appin and a pumping main or combination of pumping main and gravity sewer to the Glenfield system, possibly via a second pumping station at Rosemeadow.
机译:根据新南威尔士州政府优先排污计划(PSP),环境,气候变化和水务部已将Appin村确定为提供排污的高度优先事项。悉尼水务公司的首选方案是为现有村庄提供压力下水道网络,并将污水输送到北部约10.9公里,海拔低70m的格伦菲尔德污水处理系统。路线最初上升30 m,然后下降104 m,然后在其最后部分上升。它也受到正在开采的煤炭措施的影响,导致地面沉陷。传输系统的概念设计包括位于Appin的泵站以及可能通过Rosemeadow的第二个泵站通往Glenfield系统的泵站或泵站和重力下水道的组合。

著录项

  • 来源
    《Water》 |2010年第5期|P.84-85|共2页
  • 作者

    A Torbaty; G Amblin;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号