首页> 外文会议>Pipelines 2007: advances and experiences with trenchless pipeline projects >Pipelines, Trains and Automobiles:Rehabilitation of an 18' Sewer with No Excavation -Howard Street Sewer Project, Framingham, MA
【24h】

Pipelines, Trains and Automobiles:Rehabilitation of an 18' Sewer with No Excavation -Howard Street Sewer Project, Framingham, MA

机译:管道,火车和汽车:修复未开挖的18英寸下水道-马萨诸塞州弗雷明汉的霍华德街下水道项目

获取原文
获取原文并翻译 | 示例

摘要

As part of a sewer replacement project, the Town of Framingham, Massachusettsrndetermined the most effective construction method to repair a failing 18-inch sewerrnlocated directly underneath a heavily traveled Massachusetts Bay Transit Authorityrn(MBTA) and CSX Corporation (CSX) railroad, and located in a downtown area with highrnvehicle and pedestrian traffic. The rehabilitation of this sewer was made without anyrnexcavation, by slipping a new 12-inch replacement pipe inside the old failing 18-inchrnsewer, essentially creating a new pipe inside the old failing pipe.
机译:作为下水道更换项目的一部分,马萨诸塞州弗雷明汉镇确定了最有效的施工方法,以修复位于马萨诸塞州海湾运输管理局(MBTA)和CSX Corporation(CSX)铁路下方,位于市区,机动车和行人通行。通过在旧的失效18英寸下水道内打滑一条新的12英寸替换管,从而在旧失效的管道内创建新的管子,对该污水管进行了修复。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号