首页> 外文期刊>Water >AQUAPHEMERA
【24h】

AQUAPHEMERA

机译:海藻

获取原文
获取原文并翻译 | 示例
           

摘要

The Queensland Floods Commission of Inquiry interim report released on 1 August 2011 in itself appears reasonable. However, as expected, the media - with the classic wisdom of hindsight and needing to find someone to blame rather than Mother Nature - has unreasonably laid open the SEQW flood managers to litigation. The real issue appears to be: should the engineers have accepted the Bureau of Meteorology's predictions and dropped the level of Wivenhoe reservoir and risked ongoing severe water restrictions for the people of South-East Queensland, or, acted as they did and risked possible floods?
机译:2011年8月1日发布的昆士兰州洪水调查委员会临时报告本身似乎是合理的。但是,正如预期的那样,具有后见之明的经典智慧,并且需要找人而不是大自然来指责的媒体无理地向SEQW洪水管理者公开诉讼。真正的问题似乎是:工程师是否应该接受气象局的预测并降低Wivenhoe水库的水位并冒着对昆士兰州东南部人民持续严格的用水限制的风险,或者像他们那样行事并冒可能发生洪水的危险?

著录项

  • 来源
    《Water》 |2011年第6期|p.18|共1页
  • 作者

    Ross Knee;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号