首页> 外文期刊>Water >DELIVERING PACKAGE GAS CHLORINATION AND FLUORIDATION IN THE TOP END
【24h】

DELIVERING PACKAGE GAS CHLORINATION AND FLUORIDATION IN THE TOP END

机译:在最末端进行包装气体的氯化和氟化

获取原文
获取原文并翻译 | 示例
       

摘要

This paper focuses on the challenges associated with the design, delivery, commissioning and ongoing operation and maintenance of package gas chlorination and fluoridation plants in six remote communities in the top end of the Northern Territory. The project has progressed from design and construction of six complete systems through to commissioning and operation of combined gas chlorination/fluoridation facilities in three communities. It is expected that all six communities will be operating by mid-2013. Of the six communities, three are accessible only by sea or air. Three communities can be accessed by road for a limited window during the dry season of three to four months. For the remainder of the year they are cut off by flood waters and accessible by air and/or sea only. Major design considerations were related to location, lack of trained operational staff, limited communications with Darwin, logistical issues with installation and chemical deliveries, and limited access to emergency services.
机译:本文着眼于与北领地最高端的六个偏远社区中的包装气加氯和氟化工厂的设计,交付,调试以及持续运行和维护相关的挑战。该项目已从六个完整系统的设计和建造,发展到三个社区的加氯/氟化气联合设施的调试和运行。预计所有六个社区将在2013年中期投入运营。在六个社区中,只有三个社区可以通过海上或空中访问。在三到四个月的干旱季节,可以通过有限的窗口通过道路进入三个社区。在这一年的剩余时间里,它们被洪水切断,只能通过空气和/或海洋进入。主要的设计考虑因素包括位置,缺乏训练有素的操作人员,与达尔文的沟通有限,安装和化学品交付的后勤问题以及获得紧急服务的机会有限。

著录项

  • 来源
    《Water》 |2013年第4期|78-82|共5页
  • 作者

    B McDowall; R Wagland; A Dysart;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:28:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号