首页> 外文期刊>Water >The next step: Upgrade of the MembraNe Bioreactor at North Head Recycled Water Plant
【24h】

The next step: Upgrade of the MembraNe Bioreactor at North Head Recycled Water Plant

机译:下一步:北头再生水厂的MembraNe生物反应器升级

获取原文
获取原文并翻译 | 示例
       

摘要

After nine years of operation, SWC considered options to cater for the increased demand for recycled water at North Head WWTP. An audit performed by the supplier of the original membrane equipment informed SWC’s choice of upgrade option. The selected option included the replacement and upgrade of MEMCOR ® membrane modules with a new generation product by the original supplier. The upgrade that was done ‘on line’ while the plant was producing recycled water, resulted in a plant that now produces more recycled water without compromising filtrate quality at lower dollar per ML energy costs compared with the original design. Examining pre and post upgrade plant operating data allowed findings to be made on the performance of nine-year-old membranes compared with new membranes. The upgrade was also an opportunity to upgrade controls incorporating operating experience from previous years.
机译:经过九年的运营,SWC考虑了多种选择来满足North Head WWTP对循环水需求的增长。原始膜设备供应商进行的审核告知SWC选择升级选项。选择的选项包括由原始供应商用新一代产品更换和升级MEMCOR®膜组件。与原始设计相比,在工厂生产循环水时“在线”进行的升级使工厂现在可以生产更多的循环水,同时又不降低滤液质量,而且每ML能源成本更低。通过检查升级前和升级后工厂的运行数据,可以发现使用9年的旧膜与新膜相比的性能。升级也是结合以前几年操作经验升级控制的机会。

著录项

  • 来源
    《Water》 |2017年第2期|1-10|共10页
  • 作者

    K Chow; G James; P Zauner;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号