...
首页> 外文期刊>Water & wastewater international >ABB aids Cardiff Bay barrage, Andhra Pradesh irrigation
【24h】

ABB aids Cardiff Bay barrage, Andhra Pradesh irrigation

机译:ABB协助加的夫湾拦河坝,安得拉邦灌溉

获取原文
获取原文并翻译 | 示例
           

摘要

Operation of Wales' Cardiff Bay barrage is easier after an ABB upgrade of its automation control system. A £220m engineering project that took five years, the barrage is designed to regulate the level of a 500-acre lake, Cardiff Bay, by isolating it from the sea with five large sluice gates. It has three locks, one 40m X10.5m and two 40m X 8m, which allow 24-hour access to and from the bay, a step up from the earlier tide dependent bay.
机译:威尔士卡迪夫湾拦河坝的操作在ABB对其自动化控制系统进行升级之后更加容易。这项耗资2.2亿英镑的工程项目历时五年,旨在通过用五个大型闸门将其与海隔离,来调节500英亩的加的夫湾湖的水位。它有三把锁,一个40m X10.5m和两个40m X 8m,可以24小时进出海湾,这比以前依赖潮汐的海湾要高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号