...
首页> 外文期刊>Water & wastewater international >Sewer tunnel to provide overflow relief in Columbus, OH
【24h】

Sewer tunnel to provide overflow relief in Columbus, OH

机译:下水道隧道可缓解俄亥俄州哥伦布的溢流

获取原文
获取原文并翻译 | 示例
           

摘要

Construction has begun on a hard rock stormwater overflow and relief sewer tunnel 180-foot below the surface in Columbus, Ohio. The nearly 4.5-mile-long tunnel has a 20-foot diameter and will further limit combined sewer overflows (CSOs) into the Olentangy and Scioto rivers. Construction management for the tunnel project is being provided by Black & Veatch (B&V), in association with H.R. Gray, which will augment the existing Olentangy Scioto Interception Sewer (OSIS).
机译:在俄亥俄州哥伦布市地下180英尺的硬岩暴雨溢流和泄洪排污隧道已开始施工。这条长约4.5英里的隧道的直径为20英尺,将进一步限制进入下龙河和Scioto河流的下水道溢流(CSO)。 Black&Veatch(B&V)与H.R. Gray合作提供了该隧道项目的施工管理,这将扩大现有的Olentangy Scioto截污下水道(OSIS)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号