...
首页> 外文期刊>Water & waste treatment >Could a whole hire cost procurement strategy achieve savings?
【24h】

Could a whole hire cost procurement strategy achieve savings?

机译:整个租赁成本采购策略能否实现节省?

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Like so many aspects of procurement, pump hire contracts are increasingly awarded based on a price-driven strategy to accept the lowest bid considering only the rate of hire. Often, however, the savings that look good on paper can mask a whole array of potential hidden costs over the hire period. Moreover, the longer that hire period is, the more those hidden extras can add up. A more considered approach to understanding the real cost of hiring the assets involves taking into account the suitability of the pumps for the required application, man hour costs for set up and maintenance, fuel costs, environmental risk, flexibility, and the potential impact of any downtime. When these criteria are factored into a whole hire cost calculation; the 'real' cost of the project can be very different from the quote submitted.
机译:像采购的许多其他方面一样,越来越多的泵租赁合同是基于价格驱动的战略而授予的,以便仅考虑租赁率就接受最低出价。但是,通常看起来很可观的节省可以掩盖整个雇用期间的潜在隐患。此外,租用时间越长,这些隐藏的额外费用加起来就越多。一种更深思熟虑的方法来理解资产租赁的实际成本,需要考虑到泵对于所需应用的适用性,安装和维护的工时成本,燃料成本,环境风险,灵活性以及任何潜在影响。停机时间。将这些标准计入整个租金成本时;项目的“实际”成本可能与提交的报价有很大不同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号