...
首页> 外文期刊>Water resources research >Exploring the Long-Term Economic and Social Impact of Green Infrastructure in New York City
【24h】

Exploring the Long-Term Economic and Social Impact of Green Infrastructure in New York City

机译:探索纽约市绿色基础设施的长期经济社会影响

获取原文
获取原文并翻译 | 示例
           

摘要

Across the world, cities are spending billions of dollars to manage urban runoff through decentralized green infrastructure (GI). This research uses an agent-based model to explore some of the physical, social, and economic consequences of one such urban GI programs. Using the Bronx, NY, as a case study, two alternative approaches to GI application are compared. The first (Model 1) mimics NYC's current GI program by opportunistically selecting sites for GI within the city's priority combined sewer watersheds; the second (Model 2) features a more spatially flexible approach to GI siting, in which the city attempts to maximize opportunities for co-benefits within the geographic areas considered in Model 1. The effects of both approaches, measured in terms of stormwater captured and co-benefits (e.g., carbon sequestered) provided, are tracked over 20-year simulations. While both models suggest it will be difficult to meet the citywide stormwater capture goals (managing the first 2.5 cm of rainfall from 10% of impervious surfaces) in the Bronx solely through public investment in GI, Model 2 shows that by integrating GI with other city initiatives (e.g., sustainability goals and resilience planning), synergistic outcomes are possible. Specifically, Model 2 produces stormwater capture rates comparable to those obtained under Model 1, but these rates are accompanied by elevated co-benefits for Bronx communities. The results are discussed in the context of future GI policy development in NYC.
机译:在世界各地,城市正在花费数十亿美元来通过分散的绿色基础设施(GI)来管理城市径流。本研究采用基于代理的模式来探讨一些的这样一个城市GI方案的自然,社会和经济后果。使用Bronx Ny作为案例研究,比较了GI应用的两种替代方法。第一个(型号1)通过机会在城市优先合并下水道流域内选择GI的网站来模拟NYC的当前GI计划;第二种(模型2)具有更加空间的方法,其中城市试图最大化在模型中考虑的地理区域内的合作机会的机会。两种方法的影响,以雨水捕获和在20年的模拟中跟踪提供的共同益处(例如,碳隔离)。虽然这两个模型都表明,虽然仅通过在GI的公共投资中,难以满足全市雨水捕获目标(管理从10%的降雨从10%的降雨量),而是通过将GI与其他城市集成,达到Bronx。倡议(例如,可持续发展目标和恢复力规划),也是可能的协同结果。具体而言,模型2产生与模型1中获得的雨水捕获率相当,但这些速率伴随着Bronx社区的高效益。结果在纽约市未来GI政策发展的背景下讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号