首页> 外文期刊>Water Resources Management >A Generalized Interval Fuzzy Chance-Constrained Programming Method for Domestic Wastewater Management Under Uncertainty – A Case Study of Kunming, China
【24h】

A Generalized Interval Fuzzy Chance-Constrained Programming Method for Domestic Wastewater Management Under Uncertainty – A Case Study of Kunming, China

机译:不确定条件下生活污水管理的广义区间模糊机会约束规划方法-以昆明市为例

获取原文
获取原文并翻译 | 示例
       

摘要

In this study, interval mathematical programming (IMP), m λ -measure, and fuzzy chance-constrained programming are incorporated into a general optimization framework, leading to a generalized interval fuzzy chance-constrained programming (GIFCP) method. GIFCP can be used to address not only interval uncertainties in the objective function, variables and left-hand side parameters but also fuzzy uncertainties on the right-hand side. Also, it can reflect the aspiration preference of optimistic and pessimistic decision makers due to the integration of m λ -measure. The developed method is applied to the long-term planning of a domestic wastewater management system in the city of Kunming, China, with consideration of the eco-environmental protection of downstream water body. The solution results of the GIFCP method can generate a series of optimal wastewater allocation patterns and WTPs capacity expansion schemes under different risk levels, provide in-depth insights into the effects of uncertainties, and consider the proper balance between system cost and risk of constraint violation.
机译:在这项研究中,将区间数学规划(IMP),mλ测度和模糊机会约束规划纳入了一般优化框架,从而得出了广义区间模糊机会约束规划(GIFCP)方法。 GIFCP不仅可用于解决目标函数,变量和左侧参数中的区间不确定性,而且还可用于解决右侧的模糊不确定性。而且,由于mλ-度量的集成,它可以反映乐观和悲观决策者的抱负。考虑到下游水体的生态环境保护,将该方法应用于中国昆明市生活污水管理系统的长期规划。 GIFCP方法的解决方案结果可以生成一系列在不同风险水平下的最佳废水分配模式和WTPs容量扩展方案,提供对不确定性影响的深入了解,并考虑系统成本与约束违约风险之间的适当平衡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号