首页> 外文期刊>Water Resources Impact >THE ROAD MAP TO RESTORATION
【24h】

THE ROAD MAP TO RESTORATION

机译:恢复路线图

获取原文
获取原文并翻译 | 示例
       

摘要

As part of the Chesapeake Bay Total Maximum Daily Load (TMDL) development process, in 2010 the State of Maryland was required to provide the U.S. Environmental Protection Agency (EPA) with a Watershed Implementation Plan (WIP), a roadmap that laid out, in broad terms, the state's strategies for reaching its pollution reduction goals. Subsequently, in 2011, each of the counties within Maryland was, in turn, required to develop their own WIPs to provide more detailed strategies for how local implementation efforts would be structured in order to achieve local pollution reductions. As a result of the time and resources Anne Arundel County had already invested in assessing its watersheds and developing restoration strategies, it was one of two counties selected by the state (the other was Caroline County) to help provide technical assistance to other localities developing their own plans.
机译:作为切萨皮克湾每日最大最大载重量(TMDL)开发过程的一部分,马里兰州在2010年被要求向美国环境保护署(EPA)提供一个分水岭实施计划(WIP),该路线图是在从广义上讲,该州实现其减少污染目标的策略。随后,在2011年,又要求马里兰州的每个县都制定自己的在制品,以提供更详细的策略,说明如何组织当地实施工作,以实现本地污染的减少。由于时间和资源的原因,安妮·阿伦德尔县(Anne Arundel County)已投入资金评估其流域和制定恢复策略,这是该州选择的两个县之一(另一个是卡罗琳县),以帮助向其他地区发展其技术提供帮助自己的计划。

著录项

  • 来源
    《Water Resources Impact》 |2014年第4期|15-15|共1页
  • 作者

    ERIK MICHELSEN;

  • 作者单位

    Anne Arundel County (MD) WPRP 2662 Riva Rd. Annapolis, MD 21401;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号