首页> 外文期刊>Water policy report >Transmission Line Vacatur Highlights Big Risks For Trump NEPA Strategy
【24h】

Transmission Line Vacatur Highlights Big Risks For Trump NEPA Strategy

机译:传输线VACATUR突出了特朗普NEPA战略的大风险

获取原文
获取原文并翻译 | 示例
           

摘要

An appellate court's recent decision to preserve its vacatur of a permit for a major transmission line, and instead order a lower court to determine if it can remand the permit without vacating it, is highlighting risks for the Trump administration's strategy of swiftly advancing major projects amid ongoing litigation over their environmental reviews. Regardless of what the courts ultimately decide, the decision is another example of the risks for under-construction infrastructure projects "posed by the regulatory 'streamlining and 'just say yes' approach the Trump administration favors," analysts at Clear View Energy Partners say in a recent research note. "If agencies fail to fulfill their legal requirements, and changes to agency regulatory guidance continue to lag, other projects may face similar risk." Clear View says these risks extend to several major natural gas pipelines that are under construction, including Mountain Valley and Atlantic Coast, which are facing major delays due to successful appeals of NEPA reviews and other permits. At issue here is Dominion Virginia Power's Skiffes Creek transmission project, serving southeast Virginia. The utility activated the power lines just two days before the U.S. Court of Appeals for the District of Columbia in March ruled in National Parks Conservation Association (NPCA) v. Todd Semonite, et al. to vacate the U.S. Army Corps of Engineers' permit. The court found that the Corps failed to conduct a stringent environmental impact statement (EIS) under the National Environmental Policy Act (NEPA) for the project, which traverses the historic James River.
机译:一个上诉法院最近的决定保留了一个主要传输线的许可证的储存,而是为了确定它是否可以在不腾出的情况下确定它是否可以重新承认许可证,这是突出了特朗普政府迅速推动了主要项目的战略的风险正在进行的诉讼环境评论。无论法院最终决定什么,决定是建设资产基础设施项目的风险的另一个例子,“监管”精简和“只是说是”方法特朗普政府的兴趣,“Clear View Energy Partners表示最近的研究说明。 “如果机构未能履行其法律要求,以及对机构监管指导的变化继续滞后,其他项目可能面临类似的风险。”明确的观点表示,这些风险延伸到正在建设中的几个主要天然气管道,包括山谷和大西洋海岸,这面临着由于NEPA评论和其他许可的成功上诉而面临重大延误。在此处的问题是Dominion Virginia Power的Skiffes Creek传输项目,服务于弗吉尼亚州东南部。该实用程序仅在美国哥伦比亚地区举行的200天前激活电力线,于3月在国家公园保护协会(NPCA)v。托德Semonite等。腾出美国军队的工程师许可证。法院发现,该军团未能根据国家环境政策法(NEPA)为该项目进行严格的环境影响声明(EIS),该项目遍历历史悠久的詹姆斯河。

著录项

  • 来源
    《Water policy report》 |2019年第12期|19-20|共2页
  • 作者

    Dawn Reeves;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号