首页> 外文期刊>Water asset management international >Hydraulic criticality in a water network rehabilitation plan
【24h】

Hydraulic criticality in a water network rehabilitation plan

机译:水网修复计划中的水力临界

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Aging infrastructure is requiring US utilities to undertake asset management programmes to achieve efficient investment and minimize disruption to supplies. In this paper, Annie Vanrenterghem, Erik Bernard and Peter Galant describe a method for evaluating the impact of water main failure on service delivery when prioritizing pipes for rehabilitation in a water network. The method considers the direct impact of the broken main as well as impacts of a shutdown for the main repair on the rest of the network.
机译:老化的基础设施要求美国公用事业公司进行资产管理计划,以实现有效的投资并最大程度地减少供应中断。在本文中,Annie Vanrenterghem,Eri​​k Bernard和Peter Galant描述了一种方法,该方法在对供水网络中的修复管道进行优先排序时,评估了主水管故障对服务提供的影响。该方法考虑了断开的主电源的直接影响以及主维修的停机对网络其余部分的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号