...
首页> 外文期刊>Waste news >Two Caterpillar plants reach zero
【24h】

Two Caterpillar plants reach zero

机译:卡特彼勒的两家工厂达到零

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Two Caterpillar facilities in England achieved zero waste to landfills in 2010, the company said. The Caterpillar Remanufac-turing and Components Division United Kingdom Hose Assembly plant in Leicester and the Caterpillar Logistics Services operation in Desford have reached the 100% recycling level in their respective facilities, Caterpillar said. "Caterpillar recognizes that providing sustainable solutions starts with having sustainable operations," said Doug Oberhel-man, the company's chairman and CEO. "That's why we've established corporate long-term goals focused on sustainability for all of our operations worldwide. One of those operational goals is to eliminate waste by reducing waste generation and reusing or recycling all that remains."
机译:该公司表示,2010年在英格兰的两家Caterpillar工厂实现了零填埋垃圾处理。卡特彼勒说,卡特彼勒再制造和部件部英国莱斯特的软管装配厂和德斯福德的卡特彼勒物流服务部门的各自设施的回收率已达到100%。该公司董事长兼首席执行官道格·奥伯赫尔曼(Doug Oberhel-man)说:“卡特彼勒认识到提供可持续解决方案始于可持续运营。” “这就是为什么我们为全球所有业务建立了以可持续性为重点的公司长期目标。这些业务目标之一就是通过减少废物的产生并重新利用或回收剩余的废物来消除废物。”

著录项

  • 来源
    《Waste news》 |2011年第19期|p.16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号