...
首页> 外文期刊>Waste disposal and water management in Australia >Little Para Dam Upgrade - Big on Innovation
【24h】

Little Para Dam Upgrade - Big on Innovation

机译:小帕拉大坝升级-注重创新

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A combination of new technology, engineering innovation and lateral thinking has been applied to the safety upgrade of the Little Para Dam in South Australia by specialist construction firm CivilTEC.rnThe dam is the first in the world to feature a composite stainless steel and concrete wall construction as part of the Hydroplus fusegate spillway control retrofit project. CivilTEC broke new ground by fabricating the composite walls for the fusegate's buckets off-site in a fabrication yard, using a purpose-developed connection system. CivilTEC recommended the stainless steel/concrete composite construction - rather than the more usual concrete walls - to meet the cost saving and environmental targets of the client, SA Water.
机译:专门的建筑公司CivilTEC将新技术,工程创新和横向思维的结合应用于南澳大利亚的Little Para大坝的安全升级。rn该大坝是世界上第一个采用不锈钢和混凝土墙复合结构的大坝作为Hydroplus熔断器溢洪道控制改造项目的一部分。 CivilTEC使用专门开发的连接系统,通过在制造场内为现场组装机门的铲斗的复合墙制造了新的突破。 CivilTEC建议使用不锈钢/混凝土复合结构-而不是更普通的混凝土墙-以满足客户SA Water的节省成本和环保目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号