首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Murphy biding time over Vietnam project
【24h】

Murphy biding time over Vietnam project

机译:墨菲的越南项目的弯腰时间

获取原文
获取原文并翻译 | 示例
       

摘要

US oil and gas operator Murphy Oil is waiting for investment conditions to improve in Vietnam before accelerating its Lac Da Vang oil project in the offshore Cuu Long basin. Houston-based Murphy has long highlighted the value and size of the Lac Da Vang project in Block 15-1/05, its satellite discoveries and the remaining exploration prospectivity. Block 15-1/05 contains the Lac Da Vang, Lac Da Nau and Lac Da Trang discoveries plus several exploration prospects - Lac Da Hong, Lac Da Trang West and Lac Da Trang North-West.
机译:美国石油和天然气运营商墨菲石油正在等待越南改善投资条件,然后在乌乌长盆地海上加速其Lac da Vang石油项目。 休斯顿的墨菲长期以来突出了Lac Da Vang项目的价值和大小,在15-1/05,其卫星发现和剩余的勘探前景。 框15-1 / 05包含Lac da Vang,Lac da Nau和Lac da Trang发现加上几个探索前景 - Lac da Hong,Lac da Trang West和Lac da Trang西北。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号