首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Petrobras in push to tackle pre-salt CO2 issue
【24h】

Petrobras in push to tackle pre-salt CO2 issue

机译:Petrobras推动以粘附前的CO2问题

获取原文
获取原文并翻译 | 示例
       

摘要

BRAZILIAN oil giant Petrobras is developing a novel technology solution to cope with potential problems arising from the use of flexible risers with a series of floating production, storage and offloading vessels installed at pre-salt fields in the prolific Santos basin. The first engineering, procurement, construction and installation (EPCI) contract of this kind being offered by Petrobras -sources said it could be worth $500 million to $1 billion - covers five large FPSOs installed in the Tupi field. However, the scope can be replicated at other developments in the pre-salt play.A few years ago, Petrobras recorded three separate failures on flexible pipes used to reinject gas into the Tupi and Sapinhoa fields - incidents the oil company attributed to problems related to stress-induced corrosion cracking from carbon dioxide (SC-CO_2).
机译:巴西石油巨头Petrobras正在开发一种新的技术解决方案,以应对使用柔性立管引起的潜在问题,其中一系列浮动生产,储存和卸载容器,在多产桑托斯盆地的盐场。 由Petrobras -Sources提供的这类产品的第一个工程,采购,建筑和安装(EPCI)合同表示,它可以将5亿美元的价值为10亿美元至10亿美元 - 覆盖在Tupi领域安装的五个大型FPSO。 然而,范围可以在盐前的其他开发中复制。几年前,Petrobras在柔性管上录制了三个独立的故障,用于将气体加入Tupi和Sapinhoa领域的柔性管道 - 石油公司归因于与之相关的问题 来自二氧化碳(SC-CO_2)的应力诱导的腐蚀裂解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号