...
【24h】

Mero-2 FPSO hull set to sail

机译:Mero-2 FPSO船体设置为帆

获取原文
获取原文并翻译 | 示例

摘要

CHINA Merchants Heavy Industry (CMHI) shipyard is set this month to deliver the hull of a floating production, storage and offloading vessel destined to work on a huge pre-salt development off Brazil. The Sepetiba FPSO, built under the second generation of Dutch floater giant SBM Off-shore's innovative Fast4Ward concept, is destined for the Petrobras-operated Mero-2 project. The floater - which is also denominated as CMHI-220 MPF A - will be towed from CMHI's facility in Haimen in eastern China's Jiangsu province to Tianjin city in northern China for integration with the top-sides at Bomesc Offshore Engineering. Delivery of the full FPSO is expected in March next year. SBM contracted the yard to build the hull for Mero-2 unit in 2018.
机译:中国招商重型工业(CMHI)造船厂将于本月设定为浮动生产,储存和卸载船舶,注定要在巴西享受巨大的盐开发。 Sepetiba FPSO,由第二代荷兰浮动巨头SBM off-Shore的创新的Fast4ward概念建造,注定用于Petrobras操作的Mero-2项目。 浮动 - 也以CMHI-220强积金A计为代计取者 - 将于中国东部的江苏省海门的CMHI的设施拖往中国北部天津市,融合了与BOMESC海上工程的顶级工程。 预计明年3月将在3月份提供全FPSO。 SBM于2018年签订院子以建造Mero-2单位的船体。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号