【24h】

Castberg sailaway delayed

机译:Castberg Sailaway推迟了

获取原文
获取原文并翻译 | 示例
       

摘要

SAILAWAY of Equinor's problem-hit floating production, storage and offloading unit for the Johan Castberg oilfield development off Norway has been hit with another delay, but the operator is still targeting start-up in less than three years. Last August, Upstream revealed that the Norwegian state-controlled operator was forced to check every weld seam on the floater hull at Sembcorp Marine (Semb-marine) in Singapore due to quality issues. In October, Equinor reported that the Johan Castberg project would be delayed by one year, with first output planned for the fourth quarter of 2023.
机译:Johan Castberg Oilfield开发的Sailaway of Equinor的浮动生产,储存和卸载单位挪威开发的另一个延迟,但运营商仍然在不到三年内定位启动。去年8月,上游透露,由于质量问题,挪威国家受控运营商被迫在新加坡的Sembcorp Marine(Semb-Marine)的Floater Hull上的每个焊缝。 10月,欧安人民报告说,约翰·卡斯贝格项目将延迟一年,第一个2023年第四季度计划计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号